Every project gets its plans, its checks and its sign-in, without the retyping.
Obliwise started in project work. Safety management plans, SWMS and registers are generated for each new project from the records you already keep, subcontractors prequalify before they mobilise, and the gate checks every worker's tickets and inductions.
Start with oneStart with any one of these on its own, and add the others only if and when you want them.
What construction teams use most
The capabilities that matter most in construction, all ready on the first day.
Plans that write themselves
Safety plans and other documents are produced from the records you already keep.
Plans per project, site or anything else
You choose whether plans are produced per project, per site or per any other record, and when.
Safe work method statements
Method statements and work instructions are produced to the format your industry expects.
Project readiness and high-risk work
High-risk work is listed per project and a readiness check confirms what must be in place before work starts.
Pre-starts and toolbox talks
Pre-starts and toolbox talks are recorded with attendance, and a no-go decision raises the follow-up automatically.
Prequalification
Each company's prequalification status is tracked against the requirements for its work.
Crew qualifications checked
Every crew member's licences and training are checked before the permit is issued.
Checks before entry
Inductions, licences, medicals and site capacity are checked at the gate, so nobody starts work without what the site requires.
Health risk packs
Ready-made packs cover silica, asbestos, noise, lead, welding fume, vibration and more.
Defects and pre-start checks
Pre-start checks raise defects against the right item, and defects are tracked through to repair.
The parts that fit construction
Each one is sold on its own. Take the ones you need.
- Documents and generated plansSafety plans, registers and documents generated for each project and site.
- Contractor managementPrequalify contractors and keep their insurance and licences current.
- Permits to workPermits to work with approvals, isolations and gas tests.
- Visitor and site sign-inSign-in for visitors, staff and contractors at any entrance.
- Projects, plant and field workProjects, plant, pre-starts and defects in one place.
- Incident managementReport incidents and hazards, investigate them and track the actions.
- Occupational health and chemicalsExposure monitoring, health surveillance and a chemical register.
- Training and competencyTraining records, licences and renewals for every worker.
Worked example: a new project mobilises
A builder starts a six-storey residential job next month.
Step 1: Plans written for the project
The safety management plan, the high-risk work register and the emergency plan are produced for the project from its details.
Step 2: Subcontractors prequalified
Each trade prequalifies through the portal, uploads its insurance and adds its workers before day one.
Step 3: The gate checks every worker
Workers sign in with a code at the gate. Tickets, inductions and the SWMS they must read are checked before entry.
Step 4: Pre-starts every morning
Each crew's pre-start is recorded on a tablet, and a no-go raises the follow-up for the site manager straight away.
See how Obliwise fits construction.
Bring a form, a plan or a checklist you use now. We will set it up in Obliwise with you and show you the follow-up as it happens.